Kara has undertaken the implementation of the Produced Water Injection Project at Marun 4, as part of its ongoing commitment to provide specialized engineering and technical services within the oil, gas industries.
In this project, following the installation and commissioning of a Pump Station, the produced saline water separated from crude oil is injected into a disposal/injection well in accordance with the operator’s technical specifications.
All installation, testing, and commissioning activities have been carried out in full compliance with HSE requirements, international standards, and the technical regulations of the National Iranian South Oil Company (NISOC).
The use of high-quality equipment, precise design, and continuous supervision by the company’s engineering team have ensured safe and reliable operation throughout all project phases.
Carrying out Water Injection Project at Marun 4 in less than 4 months (engineering, design, international procurement and execution) exemplifies Kara’s technical expertise and operational capability in executing critical projects in the oil and gas sector.